SeyfertSoft logo

Case Studies

Client outcomes

Selected examples of the work we have delivered across healthcare and manufacturing.

HealthcareRegional Hospital Network

Healthcare Integration Platform for a Multi-Site Hospital Network

Challenge

The client's integration engine was aging, expensive to license, and difficult to support. Interfaces failed silently, and adding new EHR connections took weeks.

Solution

SeyfertSoft designed and deployed a modern interface platform using open-source integration technology, rebuilt the critical HL7 interfaces, and added monitoring, alerting, and error recovery.

Results

  • Migrated 40+ interfaces with zero downtime during cutover
  • Reduced interface onboarding time from weeks to days
  • Improved visibility into message flow and failures
  • Eliminated proprietary integration-engine licensing costs
ManufacturingIndustrial Equipment Manufacturer

Custom ERP for Engineer-to-Order Manufacturing

Challenge

The manufacturer's off-the-shelf ERP could not handle the complexity of engineer-to-order quotes, project costing, and shop-floor scheduling.

Solution

SeyfertSoft built a custom ERP module integrated with the client's accounting system, providing project lifecycle tracking, materials planning, and real-time costing.

Results

  • Reduced quote-to-production cycle by 35%
  • Improved project margin visibility
  • Eliminated duplicate data entry between sales and production
  • Enabled scalable growth without replacing the core ERP
HealthcareDiagnostic Imaging Chain

PACS Migration for a Diagnostic Imaging Chain

Challenge

The client needed to migrate several years of imaging studies to a new PACS vendor while maintaining access for radiologists and referring physicians.

Solution

SeyfertSoft planned and executed the migration in phases, validating study integrity, reconciling metadata, and coordinating downtime windows with clinical staff.

Results

  • Migrated millions of imaging studies without data loss
  • Maintained clinical access throughout the transition
  • Completed the project ahead of schedule
  • Reduced long-term storage and support costs